On November 1, 2022, the civil works of 300t/H cooling water circulation system developed and constructed by our company began to be constructed.
The self-developed TERKKIN control system is used for large-scale injection molding equipment, large-scale extrusion molding production line equipment and mold cooling. The pipeline is 1000 meters long, with a water cooling capacity of 300 tons per hour and a water storage capacity of 280 tons. It is installed in Building 1 of the park, which is the largest cooling water system in the park at present.